SystemLink — MAHA

MAHA/Innovations/SystemLink

Workshop networking

SystemLink

Workshop equipment in a data network

One dashboard for everything MAHA builds: SystemLink brings together the status, capacity utilisation and maintenance needs of all networked MAHA equipment — at one or several sites.

SOP 2027

The data is there. It’s the overview that’s missing.

Brake tester, shock absorber tester, headlight tester — all equipment works autonomously and stores data locally. Capacity utilisation, error messages and maintenance intervals aren’t in any central location; patterns in fault situations and usage behaviour remain hidden, and maintenance issues don’t become apparent until the equipment has come to a standstill.

Central overview

All linked equipment and systems on one dashboard — real-time status, capacity utilisation, maintenance needs, for one site or across several sites. Measurement results, usage cycles and fault messages are aggregated, making patterns visible and processes comparable.

Predictive maintenance

Maintenance needs are forecast from usage data — not extrapolated back from the breakdown. Downtime is minimised and maintenance becomes easier to plan.

Data sovereignty for you

Your data stays in your infrastructure. None of it is passed on to MAHA; there’s no external cloud requirement.

Networking and safety

Bluetooth is used within the hall; the gateway connects your existing network across locations — without any additional cabling between devices. Safety features to Performance Level d (EN ISO 13849-1), conforming to the European CRA (cybersecurity) and RED (radio equipment) directives.

Step-by-step connection

Getting started in 2026 with the CONNECT brake tester. Additional MAHA equipment will become SystemLink-ready on a phased basis, including the MA STAR H 4.5 as an add-on module. Start with one piece of equipment — no need to pay for a platform up front.

Features and test scope

Related technologies

← All innovations

Status legend

The innovations shown are at different stages of development. They are not available at short notice and will not necessarily be implemented in the version shown at the trade fair.

Research approach
A technical idea is being investigated. Whether and how it can be implemented as a product is still open.
Concept phase
The solution principle and intended benefit have been defined. The technical implementation is still being worked out and verified.
In development
The solution is being technically implemented or further developed. Features, design and dates may still change.
Field test
A prototype is being tested under real operating conditions. The results feed into further development.
SOP 2027
Start of series production (Start of Production) is planned for 2027.

Questions about this technology?

Product management and sales can provide information on availability, configuration and requirements for use.

Get in touch